Contractor for construction of railway on Ada Bridge to be known by March 10, 2017 – France's Colas Rail offers best price
Comments
(Photo: Suzana Obradović)
The Belgrade Land Development Public Agency should disclose which company has been awarded the contract by March 10, 2017.
The deadline for the completion of works is 420 days from the possession of the site, which means that the Cukarica and the New Belgrade coasts will be linked by railway in 2018.
The works entail laying down tram tracks on the Ada Bridge, north and south structures, to be incorporated in the current railway construction, as well as the reconstruction of the current bridge components and the accompanying infrastructure.
The new two-track tram railway will have a total length of 2,700 meters with connections to the current network, and around 1,000 meters of the current tram network will be developed.
The laying down of tram tracks on the Ada Bridge will enable tram transportation in all directions between New Belgrade, Rakovica, Banovo Brdo and the city's center.
Companies:
JP Direkcija za građevinsko zemljište i izgradnju Beograda
Strabag d.o.o. Beograd
Strabag AG Wien
Tags:
Ada Bridge
Ada Bridge railway
Ada Bridge tram transport
Ada bridge tram railway
railway over the Sava
the river Sava
Colas Rail
Strabag SE
Zua SA
tram railway
tram railway construction
New Belgrade Rakovica tram connection
New Belgrade tram network
Ada Bridge trams
Ada tram railway
Belgrade trams
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.