Construction of Technical-Passenger Station Zemun to start in mid-July – Reconstruction of old facility and building of new one planned
Source: Tanjug
Tuesday, 25.06.2019.
11:44
Comments
Illustration (Photo: SB7/shutterstock.com)
TPS Zemun is meant for the maintenance of passenger trains. A small part of it was built back in the 1970s and put into operation in the early 1980s. Nothing has been done since then.
Srbija Voz told Tanjug that the old facility would be reconstructed, but also that a new, modern section would be built, on a total of 35 hectares of land between the Zemun and Zemun Polje stations, allowing for modern train control and management and great savings in time and money.
Jovic said that, on June 4, following a tendering procedure, an agreement on the execution of works was signed with the consortium of Energoprojekt Niskogradnja – Energoprojekt Oprema and Colas Rail S.A.S. From France, worth EUR 50.9 million.
This is a loan from the European Bank for Reconstruction and Development, and the deadline period for the completion of works is 27 months.
In his statement for Tanjug, Jovic points out that the construction of TPS Zemun creates conditions for modern maintenance of old and new passenger trains, considerably upgrading the work of the employees, increasing traffic safety and improving the level of service, in line with European standards.
– We expect the works to start between July 15 and 25 – Jovic said.
Within the TPS Zemun complex, a unique linear technological process will be formed, unifying all the aspects of the maintenance of electric-engine trains, passenger cars and locomotives, which will increase the availability of trains.
The project entails the construction of a new hall for the maintenance of EMG 413 (Stadler and new EMG engines), a new hall for the maintenance of passenger cars, a new hall for exterior cleaning, a new building for the dispatching of trains, new automatic measuring station for the diagnostics of vehicles, new boiler rooms with a compressor station, 17 km of new tracks and covered pumping stations.
The plan also includes the construction of facilities for temporary storage of waste and facilities for the accommodation of staff.
When it comes to the reconstruction and repair of the existing facility, the plan covers the upper and the lower railway track elements, the hall for the maintenance of EMG 412, the wheel processing facility, sand storage and oil and water storage.
Companies:
Srbijavoz a.d. Beograd
Energoprojekt Niskogradnja a.d. Beograd
ENERGOPROJEKT OPREMA a.d. Beograd
Ogranak Colas Rail SA Beograd
Colas Rail
EBRD Evropska banka za obnovu i razvoj Beograd
Beograd na vodi d.o.o. Beograd
Tags:
Technical Passenger Station Zemun
TP Station Zemun
Prokop station
Aleksandar Stevanovic
Jugoslav Jovic
construction of Zemun technical passenger station
passenger train maintenance
train maintenance
construction of hall for maintenance of EMG 413
construction of hall for maintenance of passenger cars
measuring stations for diagnostics of vehicles
construction of new rail tracks
train engine maintenance
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.