City of Novi Sad opens invitation for construction in DTD Canal-Danube confluence area
Source: eKapija
Monday, 09.09.2019.
14:17
Comments
(The preliminary design) The City of Novi Sad has opened a non-binding public invitation for letters of interest for the development and construction in the area of the confluence of the Danube-Tisa-Danube Canal and the Danube river.
As said in the documentation, the task entails the repurposing, adaptation and /or construction of commercial, sports, cultural, entertainment, tourist, congress, exhibition, marketing, hospitality and/or office infrastructure in the said area.
– The repurposing and the construction can be done in the area bordered on the east and the south by the DTD Canal and the Danube, whereas the defense line on the so-called “spike” is realized in the form of a wharf wall, whereas an earthen levee is built on the northern side of the DTD Canal – it is said.
Along with the public call, the preliminary designs awarded at the architectural contest for the pedestrian-infrastructural bridge on the DTD Canal and the hospitality-commercial facility were presented as well.
As said, the preliminary designs are meant only for illustrative purposes and are therefore not binding. In other words, interested parties are free to propose alternative solutions, which can entail an entirely different concept of development and construction in the said area.
Letters of interest may be sent by November 8, 2019.
As said in the documentation, the task entails the repurposing, adaptation and /or construction of commercial, sports, cultural, entertainment, tourist, congress, exhibition, marketing, hospitality and/or office infrastructure in the said area.
– The repurposing and the construction can be done in the area bordered on the east and the south by the DTD Canal and the Danube, whereas the defense line on the so-called “spike” is realized in the form of a wharf wall, whereas an earthen levee is built on the northern side of the DTD Canal – it is said.
Along with the public call, the preliminary designs awarded at the architectural contest for the pedestrian-infrastructural bridge on the DTD Canal and the hospitality-commercial facility were presented as well.
As said, the preliminary designs are meant only for illustrative purposes and are therefore not binding. In other words, interested parties are free to propose alternative solutions, which can entail an entirely different concept of development and construction in the said area.
Letters of interest may be sent by November 8, 2019.
Companies:
Grad Novi Sad
Tags:
pedestrian bridge
bridge on the confluence of Danube Tisa Danube Canal and Danube
bridge in Novi Sad
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.