Highway section from Surcin to Obrenovac opens – Milos Veliki to reach Pozega by late 2021?
Source: eKapija
Wednesday, 18.12.2019.
13:53
Comments
(Photo: Nagy Szabi/Unsplash)
The new highway features a total of 12 bridge structures, with a span of 11 to 1,581 meters, as well as two large interchanges, Surcin and Obrenovac.
The largest bridge, near Obrenovac, 1,581 meters long and 29 meters wide, at the confluence of the Kolubara and the Sava, features 27 columns and 33 spans, and 88,000 cubic meters of concrete and over 11,500 tons of reinforcement are built into it.
Also, over 2.7 million cubic meters of sand and around 190,000 tons of asphalt are built into the Surcin-Obrenovac highway.
The opening was attended by Serbian President Aleksandar Vucic. In a conversation with representatives of the Chines company CCCC, which is also in charge of the construction of the section from Preljina to Pozega, Vucic was promised by the company's director, Zhang Xiaoyuan, that the highway would be built by the end of 2021.
The president said that the highway from Belgrade to Pozega would open in exactly two years.
Tags:
Presidency of Serbia
CCCC
Aleksandar Vučić
Zhang Xiaoyuan
Miloš Veliki
opening of a highway
Miloš Veliki highway
Surčin Obrenovac highway
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.