Gravel from West Morava to be Used in Construction of Embankment on Preljina-Pozega Highway
Source: eKapija
Monday, 26.04.2021.
09:17
Comments
Illustration (Photo: smereka/shutterstock.com)
– In the period while the dam in Parmenac is up, the plan is for the works on the regulation of the river bed through the removal of gravel layers upstream from the dam to be done and for the material to be used for the works on the highway. At the same time, the low water level will be used for the works on the inlet structure of the hydromelioration system Parmenac-Ljubic as part of the works on the revitalization of the entire irrigation system. After the dam sluices are lowered in June, the development of the river dam downstream from the dam will continue – Todorovic said on Facebook.
This way, according to him, the opening of at least one material source site in Prijevor will be kept, on an area of over one hectare, and at the same time, the bed of the West Morava will be developed, which, as he pointed out, is important for multiple reasons, for the formation of the accumulation for an alternative water supply of the city during the summer and for the reduction of flood risk.
Tags:
City of Čačak
PE Srbijavode
Milun Todorović
Goran Puzović
Shou Jicheng
gravel
West Morava
construction of an embankment
embankment
construction of a highway
Preljina Požega highway
irrigation system
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.