Innovative Solution for Construction of Cortanovci Tunnel
Source: Promo
Wednesday, 30.06.2021.
10:32
Comments
Cortanovci Tunnel (Photo: Vojislav Vujanić)
The quality and the performances of the Ultra Series: Sprayed Concrete are also confirmed by its presence in other capital projects, such as the bypass route around Belgrade for the construction of the Strazevice tunnel, the Milos Veliki highway for the works on the Brancic tunnel etc.
During the construction of the Stara Pazova-Novi Sad section within the project of reconstruction and modernization of the Belgrade-Budapest railway, over 200,000 m3 of concrete from the Lafarge concrete base stationed in Beska was installed. This production location is operational 24/7 under all weather conditions, in order to meet the demanding dynamics of the projects.
Lafarge concrete base, Beska (Photo: Vojislav Vujanić)
The reconstruction, that is, the modernization of the Belgrade-Budapest railway will drastically change the image of the railway infrastructure in these areas, since the projected train speed, following the reconstruction, on certain sections, such as the section between Belgrade and Novi Sad, will be up to 200 km/h, putting the local railway infrastructure in the rank of the most modern ones.
The tunnel and the viaduct in Cortanovci, on the slopes of Fruska Gora, comprise the biggest and the most expensive structure on the railway’s route. The complex in Cortanovci consists of a tunnel with two tubes with a total length of 2,240 meters (1,150 meters and 1,090 meters), as well as two viaduct structures with a total length of 5,931 meters (2,936 meters and 2,995 meters). The works are carried out by the Russian company RZD International. The total value of the reconstruction of the railway on the Stara Pazova-Novi Sad stretch, 40.44 kilometers long, is USD 585 million, of which the value of the Cortanovci complex alone is USD 338 million. The completion of the works on the section to Novi Sad is expected at the end of 2021.
Tags:
Sprayed Concrete
Cortanovci tunnel
construction of a tunnel
reconstruction of a railway
viaduct in Cortanovci
construction of Strazevica tunnel
Brancic tunnel
sealing works
underground construction works
construction of a reservoir
stone wall stabilization
slope stabilization
embankment stabilization
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.