Detailed regulation plan for construction of Srebrno Jezero airport adopted - Future airport will have a runway longer than 1,800 meters
Source: eKapija
Tuesday, 07.09.2021.
10:38
Comments
Illustration (Photo: Jaromir Chalabala/shutterstock.com)
As stated in the Plan, the future airport will be built on an area of 215 hectares and will bear the 4D mark.
According to the International Classification of Airports introduced by ICAO (International Civil Aviation Organization), the number 4 indicates the length of the runway, which according to the adopted plan will be over 1,800 meters, and the letter "D" indicates an aircraft with a wingspan of 36-52 meters and a distance edge of the wheels of the main landing gear from 9 to 14 meters.
As previously announced, the southern zone of the plan-covered area is intended for commercial activities aimed at development of the tourist offer and technical facilities that will work within the airport.
The plan also defines the future traffic infrastructure. The existing road to the tourist settlement Beli Bagrem connects to the state road IB row number 34, and the main traffic access to the airport will be via the new road. The construction of a new side road branching from the above mentioned one, in the length of 1.8 kilometers, is also planned.
N. I.
Companies:
Opština Veliko Gradište
Tags:
Assembly of the Municipality of Veliko Gradiste
ICAO
International Civil Aviation Organization
Srebrno jezero
Airport
Airplane
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.