Ambitious Plans for Vrsac Airport – Reconstruction of Runway to Enable Handling of ATR 72-600 Aircraft
Source: eKapija
Monday, 07.02.2022.
09:25
Comments
Illustration (Photo: Pixabay.com/Thomas Ehrhardt)
The plan, which was prepared by the Yugoslav Institute for Urban Planning and Housing (Jugoslovenski institut za urbanizam i stanovanje “Juginus”) from Belgrade, entails investments which are supposed to enable the civilian airport in Vrsac to get a regional character in the upcoming period.
As said, the airport has certain possibilities for international air traffic, but investments in the runway and the radio-navigation equipment are necessary.
The Vrsac Airport currently has three runways – a 1,000 meters long concrete runway and two grass ones, of 800 and 600 meters, and is used for the education of pilots within the Aviation Academy, for business aviation and for air-taxi services.
It is noted that the current way of the exploitation of this airport, which entails the use of small planes only, does not have the expected economic effect, so it is necessary for it to be included in the system of destinations within the tourism and business offer, for which there are excellent spatial and infrastructural conditions.
The plan entails the reconstruction and extension of the runway, the drainage system, the lighting system and the taxiways, as well as the construction of a heliport.
It is said that the current runway can be extended by 1,500 meters and to a width of 30 meters, whereby the conditions for the handling of ATR 72-600 aircraft would be met, whereas the heliport will be suitable for MI17 types.
Also, it is added, at the existing specialized center for the training of pilots (Aviation Academy), it is possible to build new facilities and revitalize the existing ones.
The plan concept also envisages a new traffic route, which will enable an efficient connecting of the complex with the wider traffic network of the city and the region.
The planned traffic route will begin with a three-way intersection with the state road and stretch toward the Veliko Srediste-Vrsac canal, the bridge over the canal and then, in the extension, toward the route of the uncategorized municipal route, follow the bank of the canal to the airport complex. The total length of the planned traffic route will amount to around 1.29 km.
The document points out that the reconstruction of the airport and the Pilot Academy will lead to the connecting of the South Banat Region with the airports in Nis, Belgrade, Podgorica, Tivat, Europe and North Africa, an increase in the frequency of air taxi services, charter flights and regular flights in the region, as well as an increase in the income from the repair of foreign planes, the possibility of transporting express post and the implementation of a “just in time” system and the possibility of using air services for the business purposes of companies from Vrsac and other features.
Let us remind that the investment in the Vrsac Airport and the Aviation Academy was announced last year, when it was said that the investments of EUR 40 million would also entail the reconstruction of the hotel, restaurant and sports hall within the complex, as well as the purchase of a helicopter and two new airplanes, the construction of a heliport, the extension of the runway, the reconstruction of the control tower and the extension of the hangar for the training of cabin staff.
The draft plan is available for an early public review for a period of 15 days from February 4.
B. Petrovic
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.