Post of Serbia to Build Solar Power Plants on Its 4 Main Facilities – Public Procurement Procedure Opened
Source: eKapija
Thursday, 29.12.2022.
12:52
Comments
Illustration (Photo: Pixabay.com/Solarimo)
According to the technical specification of the job, through an analysis of the consumption of electrical energy and the location of the facilities, and based on market research, it has been established that solar power plants may be built on four facilities of the PE Post of Serbia:
1. The Regional Postal-Logistics Center “Belgrade” (approved power 750 kW)
2. The Main Postal Center “Nis” (approved power 400 kW)
3. The Main Postal Center “Novi Sad” (approved power 600 kW)
4. The Postal Center “Kragujevac” (approved power 80 kW)
The power plants are planned to operate in parallel with the power grid, with the possibility of returning the surplus power to the grid, under the so-called prosumer system.
The tender is open until January 13.
Companies:
JP Pošta Srbije Beograd
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.