Perutnina Ptuj-Topiko to Build Chicken Farm in Backa Topola
Source: eKapija
Wednesday, 06.03.2024.
15:48
Comments
Illustration (Photo: zlikovec/shutterstock.com)
According to the urban project, the plan is to build a poultry farm complex with all the side features, access roads and footpaths, traffic and maneuvering areas, parking spaces, green areas and the accompanying infrastructure network.
The envisaged capacity of the farm, which consists of seven facilities for poultry farming is 315,000 chickens per turn, that is, 45,000 animals per facility in each turn. Throughout the year, around six chicken breeding cycles are planned. Between the two cycles, the facilities need to be cleaned, washed, disinfected and left empty for at least two weeks before the new cycle begins.
For the purposes of poultry farming, side facilities also need to be built – silos, septic tanks, a facility for the accommodation of workers etc.
The project envisages a total of six parking spaces for passenger vehicles – for the employees and visitors at the complex.
The project was prepared by Arhitop from Backa Topola, and the Belgrade-based company Structura Concept was in charge of the preliminary design.
The public inspection lasts until March 19.
A. K.
Companies:
Perutnina Ptuj-Topiko Bačka Topola
Arhitop d.o.o. Bačka Topola
Structura Concept d.o.o. Beograd
Tags:
Perutnina Ptuj Topiko Bačka Topola
Arhitop Bačka Topola
Structura Concept Belgrade
construction of chicken farm
chicken farming
chicken farm
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.