EPS plans to build brick factory within Kolubara Mining Basin

Source: eKapija Monday, 09.04.2012. 11:15
Comments
Podeli

The Electric Power Company of Serbia (EPS) plans to have a brick factory built on the grounds of Kolubara Mining Basin. The factory would be using available raw materials such as clay, waste coal and tailings from coal processing at Kolubara. The EPS invited bids during February 2012 for the design of a Study on the Possibility of Construction of a Brick Factory and then stopped the procedure.

As the EPS explained in the Official Gazette, the procedure was stopped because both bids, the one submitted by the Belgrade Faculty of Mining and Geology and the other by the Faculty of Technology and Metallurgy in Belgrade, were irregular, which is why the decision to stop the procedure was made in line with the Article 79, paragraph 1 of the Law on Public Procurements.

Comments
Your comment
Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.