Source: eKapija | Tuesday, 19.02.2019.| 13:54
Highlight an article Print out the news

Detailed Regulation Plan of a part of Block 9b presented – Plan includes construction of residential buildings, kindergartens, public service facilities...

Illustration
Illustration (Photo: Stefan Ml/shutterstock)
The Detailed Regulation Plan of Block 9b, also known as Retenzija, located in the Urban Municipality of Zemun, has been put up for a public review. As said on the website of the Belgrade Land Development Public Agency, the general aims of the preparation of the plan are the definition of a public interest, the upgrade of the existing traffic system, the maintenance and enhancement of the existing green areas and traffic routes, the reduction of the deficit of parking spaces and the enhancement of the urban features of the area.

The area covered by the plan has around 22 hectares. The biggest potential of this space lies in the locations which are to be fully transformed in line with the planned intention and the importance of the area, as well as in the construction of the needed public purpose facilities.

The main obstacles in the preparation of the draft plan were numerous commercial and mixed-purpose facilities built without a plan, the water retention facility with mobile phone antenna poles, facilities built on the route of the existing infrastructure and a high level of underground waters, the plan says.

In addition to residential facilities, the plan entails the construction of public service facilities and complexes. In line with the planned number of residents, the plan includes the construction of two preschool institutions for around 650 children, whereas school-age children will be provided with the capacities of the existing elementary schools in the area.

As said in the DRP, the green area at the water retention facility, of around 1.5 hectares, should have a twofold purpose – hydrotechnical and recreational. The construction of facilities, traffic routes or parking lots will not be allowed above the water retention facility will be forbidden, and the construction of outdoor sports courts will be allowed.

In addition to the primary and the secondary traffic systems, the plan also entails the reconstruction of the water supply system in line with the current standards and regulations. Considering that the wide area already features sewerage system receptacles, the plan is to install a secondary sewerage system within public areas.
Only logged-in users can comment.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Testiraj besplatno!
Register for our daily business bulletin, which is sent to your email address at the end of each work day.
Full information is available only to commercial users-subscribers and it is necessary to log in.
Test for free!
Testiraj besplatno!
Full information is available to commercial users-subscribers only.
Testiraj besplatno!

Log in to view complete information:
Forgot your password? Click here HERE
For free test use, click HERE