Investor from Alibunar Planning Construction of Solar Power Plant of 10 MW Next to Former Azotara Subotica

Source: eKapija Tuesday, 21.02.2023. 10:58
Comments
Podeli
Illustration (Photo: Pixabay.com/blickpixel)Illustration
The local company SOLAR S2022 doo from Alibunar plans to build a solar power plant of around 10 MW in the Subotica area.

As can be seen from the detailed regulation plan, the concrete location for the construction is in the settlement of Bikovo, in the western part of the eponymous cadaster municipality, next to the former Azotara facility.

The plan envisages the construction of the infrastructural complex of the solar facility and the placement of the produced electrical energy into the electrical energy distribution system on the whole, except for the solar power plant’s own consumption.


According to the planned concept, the solar power plant will have a maximum installed power on the panels of 12.87 MWp, that is, a maximum planned approved active output power of 9,999 kW.

The early public inspection lasts until March 6.

B. P.

Comments
Your comment
Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.