Works on Tunnel from Karadjordjeva Street to Despota Stefana Blvd to Begin in Late April or May – Shuttle Buses to Operate Line from New Belgrade to Nemanjina Street When Removal of Old Sava Bridge Starts

Source: eKapija Thursday, 07.03.2024. 08:51
Comments
Podeli
The future tunnel near the Faculty of Economics (Photo: srbija2027.gov.rs)The future tunnel near the Faculty of Economics
The first works on the tunnel from Karadjordjeva Street at the Faculty of Economics to Despota Stefana Blvd, announced for decades, according to the most recent information, should start in late April or early May. According to the president of the Temporary Organ of the City of Belgrade, Aleksandar Sapic, “the shortening of the methodology of the construction of that tunnel has succeeded” and the first works are planned to begin in Despota Stefana Blvd.

While visiting the new section of Zorana Djindjica Blvd, Sapic pointed out that, in the future, Vladimira Popovica Street would be the main boulevard which would go through a roundabout, and then to the next roundabout and then rightward to the new Sava bridge and the connection to the future tunnel. He noted that the roundabout that had been built not that long before in Vladimira Popovica Street was extremely large because the intention was for the street to be expanded by an additional lane in each direction in its extension.

– We are currently working on making the next intersection passable and establishing a leg toward Branko’s Bridge. It is important for the dynamics of the works to be such that, once the removal of the Old Sava Bridge starts, the intersection in fact becomes the traffic route to Branko’s Bridge – Sapic pointed out, adding that the plan was to use shuttle buses, which would enable switching across Branko’s Bridge rightward to Gavrila Principa Street and then to Nemanjina Street, from which the trams would operate normally.


The future bridge, whose construction in the location of the Old Sava Bridge has already caused numerous reactions, both positive and negative (Photo: beograd.rs)The future bridge, whose construction in the location of the Old Sava Bridge has already caused numerous reactions, both positive and negative


D. A.

Šta imamo u krugu od:
1 km
2 km
3 km
5 km
10 km
15 km
Fotografije:
Comments
Your comment
Full information is available only to commercial users-subscribers and it is necessary to log in.

Forgot your password? Click here HERE

For free test use, click HERE

Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno, uz konsultacije sa našim ekspertima.